Drilling Parameters
----------------------------------------------------------------------------------------------------------------------
Please enter inputs below - for percentages, enter as a fraction (eg. 85% = .85):
Drill Interval Depth: Start: ft. 
Finish: ft. 
Drill Interval Hole Size: in. 
Drill Interval Fluid Additions: bbls 
Drill Interval base fluid: fraction 
Drill Interval Average Retort Drill Solids: fraction 
Washout: fraction 
Porosity: fraction 
Commercially added Low Gravity Product: fraction